Country: Iran
Area/Province: Mazandaran
Client: Mazandaran Regional Water Authority
Main Contractor: Khatam Al-Anbia Headquarter
Supplier: HYDRONIC SAZEH
Designer: Farab Equipment Manufacturing Co.
Scope: Design, material supply, manufacturing and installation
Project Type: EPC
Start Date: Aug - 2013
Weight (ton): 310 ton
Equipment: Diversion roller gate and steel lining (Drinking pipeline) equipment
Capacity: ----
Status: Executed
Back
|