S.No Project Name Field of Activity Equipment Qty / Weight Designer Status
1 Azad Supply of main equipment for infrastructure projects Head crane 30/5 ton
Monorail 5 ton
2 pcs
1 pcs
FARAB Equipment Manufacturing Co. cooperates with KG (Republic of Korea) Executed
2 Gol Gohar Sirjan Supply of main equipment for infrastructure projects Head crane 40/30ton 1 pcs FARAB Equipment Manufacturing Co. cooperates with KG (Republic of Korea) Executed
3 Darian Supply of main equipment for infrastructure projects Monorail 15ton 1 pcs FARAB Equipment Manufacturing Co. cooperates with KG (Republic of Korea) Executed
4 Terem (Kenya) Supply of main equipment for infrastructure projects Head crane 20/2 ton 1 pcs FARAB Equipment Manufacturing Co. cooperates with KG (Republic of Korea) Executed
5 Sardasht Supply of main equipment for infrastructure projects Main crane 120/10 ton
Monorail 16 ton
1 pcs
1p cs
FARAB Equipment Manufacturing Co. cooperates with KG (Republic of Korea) Executed
6 South Pars Combined Cycle Power Plant Supply of main equipment for infrastructure projects Head crane 5to15 ton
Monorail 0.5 ton
Chain crane 0.5
electrical crane 0.5
15 pcs
1 pcs
12 pcs
3 pcs
FARAB Equipment Manufacturing Co. cooperates with KG (Republic of Korea) In Progress
7 Shiraz derak park Supply of main equipment for infrastructure projects Hybrid lighting system 50 FARAB Equipment Manufacturing Co. Executed
8 South Pars Combined Cycle Power Plant Supply of main equipment for infrastructure projects 3 / 21 ton FARAB Executed